Frames will be labelled Left, Right, Top and Bottom. Lay the content on the floor.
L Frames
Connect frames using the Hoffmann key provided when on the floor.
Slide each corner together.
Z Frames
Unlike the L Frames, the bottom of the Z frame is secured with screws with pre drilled holes.
T Post
Place the frame on the floor with the panels attached, then use a packer wedge to ensure a uniform gap at the top and bottom between the shutter side and the T-post. Once aligned, secure the T-posts by screwing them into the top and bottom.
Once the panels are aligned at the top, follow these steps:
A – Repack the frame.
B – Open the panels.
C – Partially insert the screws to mark the wall, then remove them.”